Leonardo Da Vinci Airport - Fiumicino - Structural and operational refurbishing of the flight infrastructures of Runway 16L/34R
Structural and operational refurbishing of the flight infrastructures of Runway 16L/34R
Project value: 87.738.917,60 Euros
End of works (as per contract): September 2015
Start of works: September 2014
End of works: September 2015
Expected duration of works: 320 days
Effective duration of works: 320 days
Earth movements: 1.028.489,10 m3
Sub-foundations: 254.826,39 m3
Concrete: 20.709,66 m3
Asphalt surfacing: 435.987,58 TONNES
Main interventions carried out: Organisation of the areas used as Runway Strip of runway 16L/34R. Structural/functional refurbishment of the surfacing of taxiway Delta between lanes “DA” and “DL”. Structural/functional refurbishment of the surfacing of the lanes between the runway and taxiway Delta (from “DA” to “DL”). Widening of the load-bearing surfacing and the anti-dust areas of taxi lanes “DA”, “DB”, “DC”, “DH”, “DK” and “DL”, in order to enable the transit of new ICAO code “F” A380 type aircraft.
Enhancement of the existing network for the collection of rainwater near runway 16L/34R.
Refurbishment/Re-protection of the existing AVL installations, taxiway Delta and the taxi lanes between the runway and taxiway Delta.